At Kimball, we are committed to providing industry leading production dependability and the best possible experience for our customers. In fact, we meet our marketed lead times on more than 90% of the furniture we ship. However, we certainly recognize the inconvenience that can be experienced by a lead time exception and, absolutely, want you to know that we do everything possible to get our product to you as quickly as we can.
Lead Times current as of: Wed Jun 20 03:13 PM 2018


PRODUCT GROUPPRODUCT SERIESLEADTIMENOTES
KIMBALL - CASEGOODS ACCESSORY-CG 3-4 WEEKS
ALTERNA™ 5-6 WEEKS
ASPIRE® 3-4 WEEKS
BLOOM® 3-4 WEEKS
BOOKCASE 3-4 WEEKS
COLLECTIONS 3-4 WEEKS
CONFERENCING SOLUTION 3-4 WEEKS
DEFINITION® 3-4 WEEKS
DOCK® CONFERENCE/OCCASIONAL 3-4 WEEKS
DOCK® TRAINING/MULTIPURPOSE 3-4 WEEKS
fiXt™ 7-8 WEEKS
FLUENT™ 3-4 WEEKS
GUIDE™ 3-4 WEEKS
INNSBRUCK™ 3-4 WEEKS
KORE™ 4-5 WEEKS
MASCOT™ 3-4 WEEKS
OVERBED TABLES 6-7 WEEKS
PRESIDENT™ 3-4 WEEKS
PRIORITY™ BENCHING LAMINATE 3-4 WEEKS
PRIORITY™ BENCHING VENEER/SUPPORT 3-4 WEEKS
PRIORITY™ HEIGHT ADJUSTABLE 3-4 WEEKS
PRIORITY™ LAMINATE 3-4 WEEKS
PRIORITY™ VENEER 3-4 WEEKS
SANCTUARY™ 4-5 WEEKS
SCENARIO™ 3-4 WEEKS
SENATOR™ 3-4 WEEKS
STOW™ STORAGE/WALL PANELS 3-4 WEEKS
TEEM® MEDIA CABINET 3-4 WEEKS
THEO™ 5-6 WEEKS
TRANSCEND® 3-4 WEEKS
UNIVERSAL LATERAL FILING 3-4 WEEKS
KIMBALL - SYSTEMS ACCESSORY 3-4 WEEKS
CANOPY® SURF/BASE LAMINATE 8-9 WEEKS
CANOPY® SURF/BASE METAL 8-9 WEEKS
CANOPY® SURF/BASE VENEER 8-9 WEEKS
CETRA™ 3-4 WEEKS
FOOTPRINT® STORAGE 3-4 WEEKS
FOOTPRINT® STORAGE LAMINATE 3-4 WEEKS
FOOTPRINT® STORAGE METAL/PAINT 2-3 WEEKS
FOOTPRINT® STORAGE VENEER 3-4 WEEKS
FOOTPRINT® SUPPORT 3-4 WEEKS
FOOTPRINT® SUPPORT LAMINATE 3-4 WEEKS
FOOTPRINT® SUPPORT METAL/PAINT 2-3 WEEKS
FOOTPRINT® SUPPORT VENEER 3-4 WEEKS
FOOTPRINT® WORKSURFACE 3-4 WEEKS
FOOTPRINT® WORKSURFACE LAMINATE 3-4 WEEKS
FOOTPRINT® WORKSURFACE METAL/PAINT 2-3 WEEKS
FOOTPRINT® WORKSURFACE VENEER 3-4 WEEKS
INTERWORKS® EQ 3-4 WEEKS
NARRATE® 4-5 WEEKS
TRAXX® / TILES 3-4 WEEKS
XSEDE® ADJUSTABLE HEIGHT SURF/BASE, LAM 3-4 WEEKS
XSEDE® ADJUSTABLE HEIGHT SURF/BASE, MET 3-4 WEEKS
XSEDE® ADJUSTABLE HEIGHT SURF/BASE, VEN 3-4 WEEKS
XSEDE® ELECTRICAL/ACCESSORIES 3-4 WEEKS
XSEDE® SUPPORT/LEGS/METAL TILES 3-4 WEEKS
XSEDE® WORKSURFACE/SUPPORT 3-4 WEEKS
XSITE® 3-4 WEEKS
KIMBALL - SYSTEMS KWIK OFFICE ACCESSORY 11 DAYS
FOOTPRINT® STORAGE 11 DAYS
FOOTPRINT® STORAGE METAL/PAINT 13 DAYS
FOOTPRINT® SUPPORT 13 DAYS
FOOTPRINT® SUPPORT METAL/PAINT 13 DAYS
INTERWORKS® EQ 15 DAYS
TRAXX® / TILES 11 DAYS
KIMBALL - FILES FUNDAMENTAL® 2-3 WEEKS
LF™ SERIES 2-3 WEEKS
KIMBALL - FILES KWIK OFFICE FUNDAMENTAL® 15 DAYS
LF™ SERIES 15 DAYS
KIMBALL - UNIVERSAL JOLT™ 3-4 WEEKS
PERKS® 3-4 WEEKS
KIMBALL - UNIVERSAL KWIK OFFICE PERKS® 13 DAYS
KIMBALL - HYBRID Hum. Minds at Work.® 3-4 WEEKS
KIMBALL - SEATING ABBOTT™ 3-4 WEEKS
ACAPELLA® 3-4 WEEKS
ACCENT PILLOW 3-4 WEEKS
ADAGIATO™ 3-4 WEEKS
ALPINE™ 4-5 WEEKS
ALUMMA® 3-4 WEEKS
ARPEGGIO™ 3-4 WEEKS
BEO® 3-4 WEEKS
BINGO® 1-2 WEEKS
BLOOM® 3-4 WEEKS
BOYD® 3-4 WEEKS
CAMPOS™ 3-4 WEEKS
CLAIRMONT™ 3-4 WEEKS
COLLAGE™ 3-4 WEEKS
DELANO™ 7-8 WEEKS
ENJOY™ 3-4 WEEKS
EVENT™ 3-4 WEEKS
EXAM STOOL 3-4 WEEKS
FLIP® 3-4 WEEKS
INDEPENDENCE™ 3-4 WEEKS
ITSA™ 3-4 WEEKS
JOELLE™ 3-4 WEEKS (see notes)
JOYA™ 3-4 WEEKS (see notes)
LUSSO™ 3-4 WEEKS
MEADOW™ 4-5 WEEKS
NASH™ 3-4 WEEKS
PAIRINGS® 3-4 WEEKS (see notes)
3D Laminate, HPL & Veneer Caps & Tablets4-5 WEEKS
With Solid Surface4-5 WEEKS
With Storage Arms4-5 WEEKS
PEP™ 7-8 WEEKS
POLY™ 1-2 WEEKS
POSE™ 3-4 WEEKS
SHORE® 3-4 WEEKS
SPLENDOR® 3-4 WEEKS
SPRUCE™ 4-5 WEEKS
STATURE® 3-4 WEEKS
SYCAMORE™ 4-5 WEEKS
THEO™ 5-6 WEEKS
TUCKER™ 3-4 WEEKS
VILLA™ 3-4 WEEKS (see notes)
VISTA™ 3-4 WEEKS
WISH™ 2-3 WEEKS
WREN™ 1-2 WEEKS
XTREME™ 3-4 WEEKS
KIMBALL - SEATING KWIK OFFICE ACAPELLA® 6 DAYS
ALUMMA® 6 DAYS
BEO® 6 DAYS
BINGO® 6 DAYS
CAMPOS™ 6 DAYS
COLLAGE™ 6 DAYS
EVENT™ 6 DAYS
HERO.JUST FOR YOU.™ 6 DAYS
ITSA™ 6 DAYS
JOYA™ 8 DAYS (see notes)
POLY™ 6 DAYS
POSE™ 6 DAYS
STATURE® 6 DAYS
WISH™ 6 DAYS
KIMBALL - INTERSTUHL HERO.JUST FOR YOU.™ 9-10 WEEKS

Lead Time Notes

The lead times above are approximate and based on current capacity
and/or material availability.
Large quantities of models on an order or larger dollar volume orders
may receive lead-times greater than those posted on this website. Please
work with your project management team to confirm availability on your
specific project.
Cloud HPL is experiencing 6-7 Week Lead Time.
Kwik Office seating is 6-8 days.
Kwik Office casegoods and tables are transitioning to a 10 day lead
time.
Joelle™ Ottomans are experiencing 6-7 weeks with exception of models
K92MO24, K92RAO20, K92RO2013, K92RO2018, K92SAO20, K92SO181813 and
K92SO181818
Joya models K56MSPAG3 Black are experiencing 5-6 week lead time and
K56MSPAM3 Chrome are experiencing 5-6 week lead time. Joya chrome arms
are experiencing 5-6 week lead time.
Pairings starburst tops are experiencing extended lead time.
Villa lead time listed above includes Villa Health Lounge.
Villa Health models with either 3D laminate or solid surface arm cap
options have a 4-6 week lead time.
Villa Sleep Sofa lead time is 4-6 weeks.
Sapele and Zebrawood finishes are experiencing extended lead times