At Kimball, we are committed to providing the highest level of service to create the best customer experience. We continually strive to achieve industry leading production dependability, with the majority of our products being at a 4-5 week lead-time or less; and our Kimball Ready program offering a portfolio of products that ship in 5 and 10 days. However, some lead-time exceptions do occur that are outside our standard lead-times.

For Interwoven lead times, please consult Customer Service.

At this time, we continue to experience extended lead-times on some of our series, or models within specific series due to supply chain and labor shortages throughout the industry. Those exceptions are listed below.

Our lead-times are updated daily, so for your conveniences we recommend that you subscribe to the weekly updates by going to Account - Subscriptions - Lead Time.

Lastly, on large projects, please consult your Customer Service Account Manager or Strategic Sales Manager for lead time planning so as to better align to installation needs.
Lead Times current as of: Mon Dec 06 04:18 AM 2021


PRODUCT SERIESLEAD TIMENOTES
KIMBALL - CASEGOODS
DOCK® CONFERENCE/OCCASIONAL 5-6 WEEKS
DOCK® TRAINING/MULTIPURPOSE 5-6 WEEKS
PRIORITY™ HEIGHT DESK 7-8 WEEKS Extended lead time is for Breakfront, Facet, and In Line Models
PRIORITY™ LAMINATE 5-6 WEEKS
KIMBALL - SYSTEMS
CETRA™ 7-8 WEEKS Cetra L connectors could experience 10-11 week lead time.
FOOTPRINT® STORAGE LAMINATE 5-6 WEEKS
FOOTPRINT® SUPPORT LAMINATE 5-6 WEEKS
FOOTPRINT® WORKSURFACE LAMINATE 5-6 WEEKS
XSEDE® ADJUSTABLE HEIGHT SURF/BASE, LAM 5-6 WEEKS
XSEDE® ADJUSTABLE HEIGHT SURF/BASE, MET Standard lead time applies to Cinder (462) & Platinum Metallic (501) bases, other non standard colors could experience extended lead times. Model 45FTBCSH9P405 is experiencing 9-10 week lead time. Model 45FTBTSEF9P501 is experiencing 11-12 week lead time. Models 45FBFBEH9CP 45FBFBSH9CP, 45FTBCEH9CP, 45FTBCSH9CP, 45FTBHSEF9CP, 45FTBTDEF9CP, 45FTBTDEL9CP 45FTBTSEF9CP, 45FTBTSEL9CP are experiencing 8-9 week lead time.
KIMBALL - UNIVERSAL
PERKS® Return to Work Polycarbonate and Clear resin screens could experience extended lead time.
Return to Work Clamp Mount Screens are experiencing 5-6 week lead time.
KIMBALL - SEATING
ARPEGGIO™ Arpeggio Sides standard leadtime is currently 8-9 weeks.
AUSSIE™ 5-6 WEEKS Aussie Lounge standard leadtime is currently 8-9 weeks.
BEO® Model K58BT is experiencing 12-13 week lead time.
BLOOM® Bloom Lounge standard leadtime is currently 8-9 weeks.
BOYD® 5-6 WEEKS
CAMPOS™ 5-6 WEEKS
CIRC™ Circ sides standard lead time is 5-6 weeks
CLAIRMONT™ 8-9 WEEKS
EVENT™ 5-6 WEEKS Extended leadtime applies to quick ship models.
FLIP® 6-7 WEEKS
GEO™ 6-7 WEEKS
HELIO™ 5-6 WEEKS
INDEPENDENCE™ 8-9 WEEKS
ITSA™ 5-6 WEEKS
JOELLE™ 5-6 WEEKS
JOYA™ 5-6 WEEKS Some Joya models will be experiencing 5-6 week lead time due to parts. Joya side chairs will experience 8-9 week lead time. 4 lock models will experience 8-9 week lead time. Task model(Q)K56TMBU will experience 8-9 week lead time Models K56UPSPAG1, K56UPSPAG3, K56USPAG1, K56USPAG3 are experiencing 12-13 week lead time. Model K56MSTPA is experiencing 14 week lead time.
MELORA™ 5-6 WEEKS Melora Sides are at 6-7 week lead time.
NASH™ 8-9 WEEKS
NATE & NATTY™ 8-9 WEEKS Bar and counter stools and models K85MPUAHA4SB and K85MPXAHA4SB are have extended lead time of 9-10 weeks.
PAIRINGS® Pairings Lounge standard leadtime is currently 7-8 weeks
SMILE™ 5-6 WEEKS
STATURE® 8-9 WEEKS Stature desk and conference models have extended lead time of 21-22 weeks.
THEO™ Theo Lounge standard leadtime is 8 weeks. Theo high back and mid back models have extended lead time of 11 weeks.
TRI™ 5-6 WEEKS
TUCKER™ 10-11 WEEKS
VILLA™ Villa Lounge standard leadtime is currently 7-8 weeks
WHITTAKER™ 7-8 WEEKS 3 Seat units are experiencing 12-13 week lead time.
WISH™ 5-6 WEEKS All Wish models with the synchro mechanism and seat slide are experiencing 9-10 week leadtimes.
XTREME™ 5-6 WEEKS
DAVID EDWARD COLLECTION BY KIMBALL
ANORA™ 6-7 WEEKS Anora Lead Time is at 6-7 weeks with exception of the wood wrap models and all 2 and 3 seater models which may experience extended lead time. Models KB2L1UW & KB2L1WW are experiencing 14 week lead time.
ASPEN™ 6-7 WEEKS
CHIP™ 6-7 WEEKS
ENTOURAGE™ 6-7 WEEKS Model KB4LCLE is experiencing 10-11 week lead time.
FLO™ 6-7 WEEKS
FRILL™ 6-7 WEEKS
LOLITA™ 6-7 WEEKS
LOOPER™ 6-7 WEEKS
LSM™ 6-7 WEEKS Side chair and tables are experiencing 7-8 week lead time
OTTO™ 6-7 WEEKS
SUPERKOOL™ 6-7 WEEKS Models KC2L1MHB, KC2L1MLB, KC2L1STHB, KC2L1STLB, KCL1WHB, KC2L1WLB are experiencing 13 week lead time.
THATCHER™ 27-28 WEEKS
YNOT™ 8-9 WEEKS
Kimball Everyspace
EVERYSPACE™ LAMINATE All bookcases and display centers will have extended lead time.
EVERYSPACE™ VENEER All bookcases and display centers will have extended lead time.

Lead Time Notes

1. If a product series is impacted with extended lead-times, models
within those series on the Kimball Ready program will receive the same
extended lead time.


2. The lead times above are approximate and based on current capacity
and/or material availability. Large projects or model quantities may
receive lead times greater than those posted. Please work with your
Kimball Strategic Sales Manager to confirm availability.


3. For purchase orders marked as "Ship Complete," the lead time applied
to the order will be based on the product series with the longest lead
time.


4. Specials leadtime may be extended an additional three weeks
past quoted lead time.


5. Any orders with 405 solid surface will experience extended
lead time.


6. The following laminate colors will experience extended lead
time of 8-9 weeks: Midnight Run, Serotina, Kirsche, Citidel, Planked Raw
Oak, and Kona.


7. The following laminate colors will experience extended leadtime of 15
weeks: Willow, Porcini and Chai


8. The following ETC models have extended lead time


3 weeks delivered,,
C04MDC0101,,ROMILDA,SIDE BOARD,GLASS/WALNUT
C04MDC0201,,ROMILDA,MEDIA CONSOLE,GLASS/WALNUT
C04COF0101,,ROMILDA,COFFEE TABLE,GLASS/WALNUT


5 weeks delivered,,
C02LNG0302,,LAVERICK,LOUNGE,1 SEAT,DK GREY,NATURAL
C01SDT0201,,COHEN,SIDE TABLE,MATTE BLACK


6 1/2 WEEKS TO SHIP